Current port infrastructure

  • 3 – multipurpose berths – each 200 meters long.
  • 1 – RO-RO berth
  • 1 – 100 meter service berth
  • 4.7 km long approach channel dredged to 15.5 m inner harbor and 12.5 m outer harbor
  • Width of channel-206 m
  • Port Basin and Turning Area 595 m diameter
  • Related port infrastructure and port handling equipment & pilot boats, tugs, survey vessels, etc.
  • The port, currently, has the capacity to handle 50,000 DWT bulk carriers.
  • On-going construction work

    The deepening of the approach channel to 14.4 meters and depth along the berths is 14.5 meters. The width of the channel is 206 meters.
    The port has the capacity to handle ships up to a size of 50,000 DWT.

Current port facilities

Port Area 64,000 sq-m
Container stacking area 48,278 sq-m
Reefer area(400 points) 367sq-m
Empty container stacking area 6,815 sq-m
Storage yard 28,669 sq-m
Transit shed 3,750 sq-m
Hazardous cargo storage yard 1,800 sq-m

Cranes and yard equipment

    • 5 – Rail-mounted Cranes
      a. 2 x 40 tons, 40 m reach
      b. 1 x 16 tons, 33 m reach
      c. 2 x 10 tons cranes
  • 2 – 40 tons RTGS
  • 2 -10 tons mobile cranes
  • Refrigeration Container Sockets- 400 in No.
  • Power House Main Generators 03 Nos. (1500 KW each)
  • Power House Emergency Generator (116 KW)
  • 12 Fork lift trucks with rated lifting capacity 5 tons.
  • 2 Containers reach stackers, capacity 40 tons
  • 6 Container tractors, capacity 100 kN.
  • 4 Container semi-trailers, carrying one 40′ container or two 20′ containers
  • 4 25 t flat trucks
  • 4 10 t flat trucks
  • 8 Hoppers, 6 m x 6 m
  • 8 Mobile bagging plants, capacity 50 t/h
  • 12 Fork lift trucks, capacity 5 t
  • 2 Weighing bridges, capacity 80 t
  • 2 Fire tender
  • 1 Sweeping Vehicle
  • 1 Garbage Truck

Desalination plant

A desalination plant has been set-up at Gwadar Port to supply 100,000 gallons/day of drinking water to ships and vessels visiting the port.